Big Creek mailer

I received a letter from the folks at Big Creek yesterday, with maps of the proposed NTMP area, and request for info on surface water usage (within 10 days). Did everyone else get this ? The approx. filing date for the NTMP was listed on this mailer as 9/10. 

Pete Guilhamet
September 1, 2005